Used factory for production of tiles built in 1998, commissioned during 1999/2000 and shut down end of 2020. Capacity was 7700 m2/day when producing tils sized 33.3cm x 80cm x 8mm thickness.
Equipment includes:- (2) presses, (2) dryers, (2) enameling lines, (2) digital machines, (3) rotocolos, (2) AGV, 136 unit of boxes, (2) loading machines emamelling outlet, (1) powder application machine, (1) oven inlet discharge machine, (1) oven entry dryer, (1) Sacmi oven 106m long x 240 cm wide, (1) machine loading oven outlet, (2) machines discharge line classification, (2) classification lines with 1 line for tiles longer than 50cm and 1 line for tiles longer than 120cm, (2) packagers, (2) palletized robots, (1) section of compressors.