Used 2 MW wood biomass power plant built in 2009 and running until February 2023. Plant is made up of a steam boiler that uses forest waste as fuel and a condensing steam turbine generator, electrical room, control room.
Main equipment includes:
- Biochamm BCV-11.0000 CA biomass boiler built in 2008 with approximately 23,665 hours of use.
- Boiler feed system made in 2008 with approximately 22,549 hours of use.
- Atlas Copco compressors made in 2008.
- Water treatment plant made in 2008.
- Hamworthy condenser made in 2008 with 22,539 hours of use.
- Siemens SST-110 (TWIN AFA46 GT6) steam turbine made in 2008, with 22,539 hours of use and 563 starts.
- Leroy Somer L57 54 m7/41 alternator made in 2008 with 22,539 hours of use.
- EWK cooling towers made in 2008 with approximately 23,102 hours of use.
- Fivemasa HVAC made in 2008.
Available for relocation or in-situ with land and buildings.
We use cookies to improve your experience. Privacy Policy.